ODS Petrodata
BRAZIL: The Iroquois barge is currently completing its pipelay scope on Petrobras' Mexilhao pipeline. The work was awarded in November and was expected to be completed by mid-December due to environmental regulations but was interrupted. The scope includes the installation of 13-miles (22km) of 34-in pipe. The pipe picks up from where the Acergy Piper left off and will ultimately connect the PMXL-1 platform to shore. The Iroquois barge is being towed by the Bajo Nuevo and Goliath tugs.